Installation Process

How the pool installation process works

Getting a pool should be exciting, not stressful. Port Pools By Design follows a clear, efficient installation process from the first visit to your property through to your first swim. The team handles the detail so installing a fibreglass pool is simpler and faster.

This is the same process used for The Fibreglass Pool Company range, installed across the NSW Mid North Coast. Have questions? Request a consultation below.

Pool builder visiting a backyard to plan pool placement

1. Site visit

We visit your property to assess the ideal placement for your pool, check access points and talk through your requirements so the design can work on your site.

Laser set-out marking the pool outline on site

2. Laser set-out

Precision laser equipment is used to square the pool with your home and surroundings. Once the position is confirmed, the outline is marked on the ground ready for excavation.

Site prepared for pool excavation

3. Ready to excavate

With measurements checked by laser, there is a constant reference point for an accurate install. Excavation can then start with confidence.

Completed pool excavation with spoil removed

4. Excavation complete

The hole is excavated to size and the removed material is taken off-site.

Levelled and screeded base ready for the pool shell

5. Base prepared

The base material is levelled and screeded to the right heights so the shell sits true and the later filling process can run smoothly.

Fibreglass pool shell delivered and stored on site

6. Shell delivered

Your fibreglass pool shell is delivered and stored safely on site, ready for the crane to lower it into the prepared hole.

Crane on site ready to lift the pool shell

7. Crane on site

The crane arrives and is positioned to lift the shell into place.

Pool shell prepared and connected for the crane lift

8. Lift prepared

The team connects the lifting gear and prepares the shell for the lift.

Fibreglass pool shell being lifted by crane

9. Shell lifted

The swimming pool is lifted and moved into the backyard, ready to be placed in the hole.

Pool shell being lowered into the excavated hole

10. Shell placed

The pool is lowered into the prepared hole with the team guiding the crane so it sits correctly.

Team checking pool levels after placement

11. Levels checked

Once the shell is in the hole and disconnected from the crane, levels are checked and adjusted so the pool sits true.

Pipework connected and the pool being backfilled with water

12. Pipework and backfill

Pipework, filters and lights are connected, then water backfilling begins.

Concrete bond beam being poured around the pool

13. Bond beam

The concrete bond beam and slab are prepared and poured, which sets up the surrounding landscaping.

Finished fibreglass pool ready to swim

14. Ready to swim

Coping pavers are installed and the water is balanced. You are then ready to enjoy your new pool.